|
Appendix 1
Additional Terms and Conditions Applyig to the Pledged Real Estate
|
|
Property1 address
|
The addresses in zones 1, 2 and 3 in accordance with the Bank’s Territorial Zoning List, as well as the communities in zone 4 as specified in Clause 19; for land plots, Clause 18 shall be applicable;
|
|
Appraisal of the pledged asset (collateral)
|
The pledged asset (collateral) shall be appraised by a specialized organization collaborating with the Bank except in the cases prescribed by the internal legal acts of the Bank;
|
|
In case of public or manufacturing premises, the loan decision-making may be also made based upon a preliminary appraisal report provided the final appraisal report shall be submitted by the Client prior to loan issuance;
|
|
In the evant of an available report covering the past 36-month appraisal activities, no pledge appraisal shall be required;
|
|
Pledger
|
The Individual borrower or their spouse (including an IE), the Organization founder, or
|
|
Any individual of full legal age (including an IE) and a legal entity facing no restriction;
|
|
Requirements applying to real estate being pledged1
|
1. A real estate unit of residential, public or manufacturing value, as well as an underdeveloped residential and public land plot may be a pledge;
|
|
2. The real estate shall have a stone, panel or iron-concrete structure (apart from partition walls and inter-floor covers). The real estate shall be at least 80% complete. The maximum requirement is without interior design. Semi-constructed, incomplete or semi-dilapidated properties may not be a collateral;
|
|
3. The residential real estate may not be furnished with the necessary communications (assembled waterline, electric wires), but their absence shall not cause the property to lose its attraction;
|
|
4. The real estate shall not be a public housing or be located on the premises of any other facility, i.e. – a former dormitory or hotel or any other public facility or administrative building; it shall not be a garage, a parking lot or a car hangar;
|
|
5. Properties in multi-apartment blocks may not be a collateral provided the dismantling of the illegal buildings and facilities forming part thereof will cause the property to lose its attraction, or the real estate unit in multi-apartment blocks with makeshift (illegal) premises surpasses 50% of the legal premises. Exceptions shall apply to cases when more than 1 property units is being pledged and the liquidity value of the said pledge does not exceed 55% of the pledge basket. Property units without state registration of the ownership right may not be a subject of pledge (collateral);
|
|
6. The real estate shall not be in a building with Level 3 or higher emergency or shall not be above Level 3 emergency;
|
|
7. Whenever the property being pledged has an unpaid cadastral value, the sum total of the unpaid cadastral value and the loan shall not exceed more than 80% of the financing pledge liquidity value;
|
|
8. The construction value shall be minimum 15% in zone 1, minimum 25% in zone 2, minimum 30% in zone 3 and minimum 40% in zone 4 in the total pledge value;
|
|
9. If the real estate is owned by individuals (natural persons) under the right of common joint and/or shared ownership, all the shares shall be simultaneously deemed a pledge, with all the co-owners acting as pledgers
|
|
10. A residential real estate shall have an inter-floor cover ceiling not lower than 2.5m.
|
|
11. The residential real estate shall not be socular, or on technical-level basement and semi-basement floors. Residential houses with the surface area of each of the said units surpassing half of the home total surface may not be a subject of pledge;
|
|
12. Properties sharing a common space with another property unit, a land plot pertaining to a residential house (or a part thereof) belonging to the owners under the right of lease or gratuitous use or servitude may not be a subject of pledge;
|
|
13. Residential houses with two and more shared walls with other owners’ property may not be a subject of pledge. Exceptions shall apply to newly constructed townhouses;
|
|
14. Real estate having a part handed over for gratuitous use under a court ruling may not be a subject of pledge;
|
|
15. Whenever the real estate being pledged is a private residence, it shall be fullը pledged. Whenever it is a land plot of a property unit being pledged, it shall be privately owned, as well as have a paid cadastral value. The land plot shall have an entrance detached from community lands;
|
|
|
16. The real estate shall not be on a territory declared a prevailing public interest;
|
|
17. Opinion by the Problem Assset Management Department (PAMD) for property units with AMD 50 million and higher liquidity value: opinions shall be issued only with respect to property units with public and manufacturing value (without site examination by the PAMD) based upon photos by the appraisal company;
|
|
18. The city of Yerevan, except as specified in clauses 1-18, as well as the following cities and towns and rural communities:
Vagharshapat, Masis, Artashat, Ashtarak, Abovyan, Tsaghkadzor and Gyumri (except for the properties in zones 10-13 of the city of Gyumri included in the territorial assessment zones of the Republic of Armenia under Armenian Government Decision 1023N dated June 4, 2020), Dilijan (except for “Rotonda” [framed by coordinates: 40.740218, 44.870844-40.739515, 44.872049-40.737235, 44.868397-40.734627, 44.867563-40.734233, 44.865617-40.737746, 44.864841-40.740218, 44.870844 ), upper part of the “Kaghni Khach district” [framed by coordinates 40.748196, 44.886507 - 40.749033, 44.888828- 40.747623, 44.890443-40.746229, 44.887918-40.748196, 44.886507) and ՙՙTakhta Gorge Section՚՚ (framed by coordinates 40.751559, 44.898396- 40.753051, 44.902820-40.751928, 44.902448-40.750994-44.899839-40.751559, 44.898396]), Ijevan, Yeghegnadzor, Ajapnyak district in Jermuk, towns of Goris and Kapan, as well as Byureghavan, Argavand, Parakar-Tairov, Geghanist, Balahovit, Getargel, Yeghvard, Arinj, Dzoraghbyur, Jrvezh, Kasakh, Proshyan, Zovuni, Verin and Nerkin Ptghni, Ayntap, Nor Kharberd, Kanakeravan;
|
|
19. Communities in zone 4:
Ararat region, village of Taperakan, village of Nor Kyank, Dimitrov, village of Masis, Azatavan, Marmarashen, Jrahovit, Arevabuyr, Mrgavet, Baghramyan (Artashat), Berkanush, Goravan, Dalar, Vostan, Vosketap, Aygavan, Nizami, Sayat-Nova, Dashtavan
Armavir region: village of Armavir, village of Voskehat, village of Tsaghkunk
Aragatsotn region: village of Kuchak, village of Voskevaz, Parpi, Ohanavan, Nor Yerznka
Kotayk region: village of Kotayk, village of Akunk, Getargel, Bjni, Alapars, Karenis
Shirak region: village of Vahramaberd, village of Mayisyan, village of Azatan
Syunik region: village of Syunik (Kapan), village of Halidzor (Goris), village of Shinuhayr (Goris)
Vayots Dzor region: village of Areni, village of Aghavnadzor, village of Gladzor, village of Malishka
Lori rgion: village of Margahovit, village of Gyulagarak, Tumanyan, Dsegh, Debet, Arevshogh, Jrashen, Gargar
Tavush region: Noyemberyan, village of Koghb, village of Getahovit, Teghut
Gegharkunik region: village of Nerkin Getashen, Vardenik, villagw id Yeranos, Lichk
|
|
The expenditures pertaining tp the state registration for the pledging of real estate shall be borne by the Bank except in the cases when the Client recognizing the Bank’s right of pledge is willing to register the property subject to expedited procedures different from the standard timeframes prescribed by law.
|